Current checkpoint
Planning Tools v0.2.3+
Single endpoint architecture, mismatch protection, public explanation layer, global square-button rule and mobile QA pass are now in place.
Crux Tools / Release Gate
This page records the public website and planning-tool release gate. It keeps the current toolchain, contact flow and legal layer stable before the larger Planning Calendar / availability system begins.
Current checkpoint
Single endpoint architecture, mismatch protection, public explanation layer, global square-button rule and mobile QA pass are now in place.
Before next feature
Legal, privacy, contact and public-facing expectation language should be checked before Planning Calendar or availability data is published.
01 / Toolchain
02 / Contact
03 / Design
04 / Public explanation
05 / Legal layer
06 / Deployment QA
Legal quick links
The Planning Calendar will introduce availability, timing, holds, target windows and possibly operational status information. Before that is published, the public legal and privacy language should be checked.
If any of these legal URLs differ on the live site, update this checklist page to match the deployed legal page names.